
STADIUM TECHNOLOGY NEWS
Bills build IP-powered production hub at new Highmark Stadium
The Buffalo Bills’ new Highmark Stadium uses a standalone technology center to house production equipment, fiber connectivity and cellular-network infrastructure, allowing systems to be installed before the main control room was completed. The venue’s SMPTE ST 2110 production network supports UHD and HDR workflows, 35 cameras and Mitsubishi videoboards powered by Ross Video technology. Read more here.
Patriots pack new player facility with training technology
The New England Patriots’ new 160,000-square-foot New Balance Athletics Center includes a 10,500-square-foot virtual training room with a 20-yard turf field and screens that simulate on-field formations and assignments. Wall-sized LED displays are also installed in the draft room, team auditorium, and offensive meeting room, extending the technology across the team’s preparation and teaching spaces. Read more here.
The Monument completes $2.1 million video displayu upgrade
Summit Arena at The Monument in Rapid City has installed new video and ribbon boards to expand its presentation of live action, statistics and fan-engagement content. The $2.1 million project, which follows sound and lighting upgrades completed last year, was funded through venue revenue. Read more here.
STADIUM PROJECT NEWS
Commanders reveal seating bowl design for new stadium
The Washington Commanders and HKS have released the first renderings of the new stadium’s RFK-inspired seating bowl, designed as a continuous sweep from field level to the upper deck. The design increases lower-bowl capacity, eliminates stacked premium levels and incorporates a supporters’ wall and a videoboard system wrapping the bowl. Read more here.
Nationwide Arena launches design tender for $400 million renovation
The Franklin County Convention Facilities Authority has issued a request for qualifications for architectural and engineering services covering a multiyear renovation of Nationwide Arena. The phased project would upgrade infrastructure, concourses, concessions, accessibility, technology and premium spaces while allowing the Columbus Blue Jackets’ home to remain operational during construction. Read more here.
Ball Arena set for $135 million renovation
Kroenke Sports & Entertainment has announced a $135 million renovation of Ball Arena, home of the Denver Nuggets, Colorado Avalanche and Colorado Mammoth. Scheduled for completion before the 2028–29 season, the project will expand the east atrium, widen entrances and concourses, add three club spaces and upgrade suites, retail and fan-facing technology. Read more here.
STADIUM BUSINESS NEWS
NetApp partners with Tampa Bay Buccaneers on data infrastructure
NetApp has become an official partner of the Tampa Bay Buccaneers, extending its existing NFL relationship. The team will use NetApp’s data infrastructure and Keystone subscription service to support secure operations and the fan experience at Raymond James Stadium. Read more here.
LG to outfit transformed Capital One Arena with display technology
LG Electronics has signed a multiyear deal to provide exterior and interior LED displays, televisions and business-center screens throughout Capital One Arena. The rollout includes the “Visibowl,” featuring more than 500 feet of digital displays along the concourse, with ANC overseeing integration and ongoing service. Read more here.
A’s name Circa first founding partner for Las Vegas ballpark
The Athletics have signed a multiyear agreement naming Circa Resort & Casino and Circa Sports the first founding partner and official resort and sportsbook of the team and its future Las Vegas ballpark. The partnership will include the Circa Dugout Box premium hospitality space beside the A’s dugout and game tickets bundled with stays at the downtown resort ahead of the ballpark’s planned 2028 opening. Read more here.



